Western Industrial Park

Site development for a new 34-acre campus for Western Disposal Services. Phase 1 construction includes a Transfer Building with loading pit, Gate House, and associated site improvements. Future scopes include constructing a Shop building (33,586 SF), a Depackaging building (11,250 SF), Office Building (34,012 SF), and the remaining site improvements. 

Marriott – Boulder

Interior renovation to unused ground floor retail spaces into conference rooms and amenities spaces for hotel guests and business gatherings. The 8,000 SF+ renovation included a new kitchen and a private dining space and an operable partition between two conference rooms offered seating for 130 visitors at capacity. The existing business area and restrooms were […]

Gebhardt BMW

Interior and exterior improvements incorporating corporate branding and identity. An eyebrow roof and covering were added to the exterior providing protected vehicle display space and covered walkways while giving the building a modern appearance. New interior finishes refreshed the space to complement current BMW identity requirements. 

WeatherTech

New 59,200 SF warehouse and showroom space for WeatherTech automotive products on a 4.1 acre site. The showroom features full height glass walls with cellular diffusing daylighting and electro-chromatic tinting controls. Tilt-up concrete wall construction surrounding the warehouse improved speed of construction and long-term durability. WeatherTech takes pride in providing American made products and directed focus on […]

Pearl Parkway Centre

Three-story mixed use office building managed by W.W. Reynolds, with views of the Flatirons in Boulder.  Numerous outdoor patio and deck spaces were provided at each floor. Each floor was designed for maximum flexibility of a single use tenant or multiple smaller tenants. The final build-out accommodated 3 major tenants who each used the entire […]

Orthopedic & Physical Therapy

The merger of two orthopedic and sports medicine practices in Boulder concluded with the opening of a nearly new 20,000 SF medical office and physical therapy suite for BoulderCentre for Orthopedics & Spine. The design team worked closely with a dedicated team of surgeons, physical therapists, and administrative staff to address needs for each area […]